Send Message

UBC500101 UBC500100 Oil Cooler For Land Rover DISCOVERY IV L319 3.0

Product Details:
Place of Origin: GUANGZHOU ,CHINA
Brand Name: AFCS
Certification: ISO9001
Model Number: UBC500101、UBC500100
Payment & Shipping Terms:
Minimum Order Quantity: 5pcs
Price: negotiable
Packaging Details: Netural or customized
Delivery Time: 3-20days
Payment Terms: T/T, Western Union, MoneyGram
Supply Ability: 30000pcs/month

Detail Information

Product Name: OIL COOLER Network Size: 167x82x74
Mesh Width: 82mm Mesh Depth: 74mm
Cooling Mode: Water-cooled Car Model: For Land Rover DISCOVERY IV (L319) 3.0
Warranty: 60000 Kilometers Material: Aluminium
Year: 2006-2010, 2011-2019
High Light:

UBC500100 Oil Cooler

,

UBC500101 Oil Cooler

Product Description

OEM UBC500101,UBC500100 Oil Cooler For Land Rover DISCOVERY IV (L319) 3.0

Car Model Year Engine CC KW Type
LAND ROVER DISCOVERY IV (L319) 3.04x4 2013-2018 306PS 2995 250 Closed Off-Road Vehicle
LAND ROVER DISCOVERY IV (L319) 3.0 SDV6 SE 4x4 2009-2018 306DT 2993 188
LAND ROVER DISCOVERY IV(L319) 3.0 TD 4x4 180
LAND ROVER DISCOVERY IV (L319) 3.0 TD 4x4 2012-2018 183
LAND ROVER DISCOVERY IV (L319) 3.0 TD 4x4 2009-2018 200
LAND ROVER DISCOVERY IV (L319) 3.0 TD HSE SDV6 RAW 4x4 2010-2018 155
LAND ROVER DISCOVERY IV VAN(L319) 3.0 TD 4x4 2011-2017 188 Van
LAND ROVER DISCOVERY IV VAN (L319) 3.0 TD 4x4 180
LAND ROVER DISCOVERY IV VAN (L319) 3.0 TD 4x4 155
LAND ROVER RANGE ROVER SPORT I(L320) 3.0 D 4x4 2010-2013 155 SUV
LAND ROVER RANGE ROVER SPORTI(L320) 3.0 D 4x4 2009-2013 180
LAND ROVER RANGE ROVER SPORT I(L320) 3.0 D V6 HSE 4x4 2012-2013 183
LAND ROVER RANGE ROVER SPORT I(L320) 3.0 TDV64x4 2011-2013 188
LAND ROVER RANGE ROVER SPORT I(L320) 3.6 TD 84x4 2006-2013 368DT 3628 200

 

 

Pictures:

UBC500101 UBC500100 Oil Cooler For Land Rover DISCOVERY IV L319 3.0 0UBC500101 UBC500100 Oil Cooler For Land Rover DISCOVERY IV L319 3.0 1

 

 

 

FAQ:

 

Q1What is your terms of packing?

Generally, we pack our goods in neutral white poly bags and kaqhi boxs. If you have special requirments for box ,the packges is negotiable.

 

Q2How about your delivery time?

Generally, it will take 15 to 50 days to finish producing after receiving your deposit. 

 

Q3What is your terms of payment?
30% deposit before production ,70% of total amount should be paid before delivery.

Get in touch with us

Enter Your Message

You Might Be Into These